Addition Update
Peter has been working in the bathroom this week. He is working on the shower basin to prepare for the tile installation. Our plan is to have an open shower but that requires a slight slope to the floor where the shower basin area will be. The floor was built lower in that area and then a rubber membrane was installed. He had to weight the membrane down while it adhered. The next step is to start shaping the basin with concrete.